Fig. 3

Fig. 3 Refer to the following caption and surrounding text.

Download original image

Levelised cost of electricity, LCoE as function of ground coverage ratio, GCR, and tilt angle. Note that the contour lines are not at constant distance: up to 68 Euro/MWh, the intervals are 2 Euro/MWh, above 68 Euro/MWh the intervals are 4 Euro/MWh. (Left) full grid connection, (right) grid connection restricted to 50% of nominal DC power.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.